Load testing of Pančevački Road-Railway Bridge over the Danube River with approach structures
Realization: 2007
Steel structure above the water level is continuous lattice girder with 5 spans of 809 m length in total. Approach structures from Pančevo side are composite steel structures but from Belgrade side they are prestressed concrete structures for road traffic.
box1
