Railway Bridge at km 13+056 on the Niš-Dimitrovgrad railway line over the Nišava River
Realization: 2005
Load testing of steel truss bridge after its rehabilitation, 51.20 m long span,6.00-8.00 m high, performed in 2005.
box1

Realization: 2005
Load testing of steel truss bridge after its rehabilitation, 51.20 m long span,6.00-8.00 m high, performed in 2005.