Technical verification
Technical verification of Final design for installation of
tourist signs on the territory of the town Kragujevac
Realization: 2011
Technical verification of Final design of the highway on
Corridor 10, section: "Horgoš" border crossing - Novi Sad,
106.9 km long
Realization: 2011
Technical verification of Final design of the highway on
Corridor 10, section: Caričina dolina - Vladičin Han, 14.3 km long
Realization: 2011
Technical verification of Final design of traffic equipment and
signalization at intersection of Drobilice road to limestone mine and Kosjerić
road to marlstone mine
Realization: 2010
Technical verification of Final design of the highway on
Corridor 10, section: Vladičin Han - Donji Neradovac, 26.3 km long
Realization: 2010
Technical verification of Final design of the E-763 highway,
section: Lajkovac - Ljig, 23.9 km long
Realization: 2010
Technical verification of Final design of the highway on
Corridor 10, section: Pirot (East) - Sukovo, 6.0 km long
Realization: 2010
Technical verification of Final designs for reconstruction and
upgrading of air-conditioning and heating systems in the Palace of Serbia,
Belgrade
Realization: 2010
Technical verification of Final designs of residential and
office building complex ( B1.1-3, B2.1-3-B3A.1-3 ,B3A.4, B3B1-3) for non-profit
and social housing in the GP 1 - settlement in the west of Dr. Ivana Ribara
Street, New Belgrade
Realization: 2010
Technical verification of Final design for reconstruction of the
building of the Ministry of Telecommunications and Information Society of the
Republic of Serbia in 7, Pariska Street, Belgrade
Realization: 2010
Technical verification of Final design of residential and office
building at PFC 1 in PFC 29, Block 63 along Vojvođanska Street, New Belgrade
Realization: 2009
Technical verification of Final designs for heating
installations in the building in 34, Nemanjina Street, Belgrade
Realization: 2009
Technical verification of Final designs of "Galenika"
- new factory of solid pharmaceutical preparations in Zemun
Realization: 2008-2009
Technical verification of Final design of the office building of
"Parking Service" Public Utility Company in 21, 27 Marta Street,
Belgrade
Realization: 2008
Technical verification of Final design for Phase 1 of "Železnik"
road tunnel on the South Belgrade Bypass and the Final designs for Phase 1 of construction of "Lipak" road
tunnel on the South Belgrade Bypass
Realization: 2008
Technical verification of Final design of the General Staff
building and restoration of facades in 33, Kneza Miloša Street, Belgrade
Realization: 2007
Technical verification of Final design for reconstruction and
extension of the building with underground garage in 9, Nemanjina Street
Realization: 2007
Technical verification of Final design for rehabilitation and
remediation of the landfill in Novi Kneževac
Realization: 2007
Technical verification of Final designs of mechanical, electrical,
traffic, water supply and sewerage installations and Final architectural and
construction design and calculations in the field of civil engineering physics
for Belville residential complex in Block 67, New Belgrade
Realization: 2007
Technical verification of designs for reconstruction of clinker
transportation system in the "Titan" Cement Plant, Kosijerić
Realization: 2006
Technical approval of Preliminary design for Phase 2 of
construction of " Makiš 2" water treatment plant
Realization 2005
Technical verification of Final designs of heating plant and hot
water pipeline in the town of Valjevo
Realization: 2005
Technical verification of Final designs of the plant powered by
liquefied petroleum gas, "GANC" Hall, "Putnička" Beograd
Division
Realization: 2005
Realization: 2005 back