Roads
Preliminary Design of the new Avala Road together with accompanying infrastructure
This 4.4 km long road with 4 traffic lanes is designed for the speed of 70 km/h ...
read moreGeneral, Preliminary and Final designs for Vršac by-pass road, from Belgrade-Vršac M1.9 (E-70) Main Road to connection with Vršac-Vatin M1.9 (E-70) Main Road
This 7.9 km long road with 2 traffic lanes is designed for the speed of 100 km/h ...
read morePreliminary and Final designs of Vršac-Markovac-Romanian Border Road
Works on the existing road included widening of the present carriageway (6.50 m) as well as construction of the new alignment in the length of 20.4 km, fully in accordance ...
read moreGeneral and Preliminary designs of Kikinda by-pass road
This 14.5 km long road with 2 traffic lanes is designed for the speed of 100 km/h ...
read moreFinal Design for improvement of R-201a, class 2 road; Ralja-Parcanski Vis Section
The design included improvement of technical characteristics of the road and rehabilitation of pavement to provide better integrity, durability and bearing capacity of the ...
read moreFinal design for reconstruction of Jovanjica Dock- Hilandar Monastery, Holy Mountain, Greece
The design included improvement of technical characteristics of the road and rehabilitation of the pavement to provide better integrity, durability and bearing capacity of ...
read more