Railway Lines
Belgrade - Bar railway line
The Belgrade - Bar railway line is a single-track line for combined transport. It was constructed and put in operation in phases in the period 1952 - 1976 ...
read moreSarajevo – Ploče Railway Line
For Sarajevo-Ploče railway line, 194.6 km long, our experts prepared designs for 108 tunnels having the total length of 35 880 m as well as designs for 64 viaducts, 4570 m ...
read moreValjevo-Loznica Railway Line
For Valjevo-Loznica railway line, 68.1 km long, our experts prepared designs for 19 tunnels having the total length of 9759 m as well as designs for 69 bridges having 3977 ...
read moreMajdanpek – Bor Railway Line
For Majdanpek-Bor railway line, 42 km long, our experts prepared designs for 28 tunnels having the total length of 11305 m as well as designs for 18 bridges having 2105 m ...
read moreGeneral Design of Raška-Novi Pazar Railway Line
The line herein connects the southwestern Serbia with other regions in the country. The line corridor runs through the valley of Raška River in between the М-22 arterial road ...
read moreFinal Design of Šargan-Vitasi-Mokra Gora narrow-gauge railway line for tourist purposes
Technical documentation of Šargan-Vitasi-Mokra Gora railway line ...
read morePreliminary and Final designs for reconstruction of Niš - Dimitrovgrad railway line, Ćele Kula - Staničenje section (km 4+900 - km 64+152)
The existing Niš - Dimitrovgrad - Bulgarian bordersingle-track line was constructed in 1888. This railway line is not electrified and its length is 104 km. Together with the ...
read moreFinal design for construction of additional track together with related infrastructure, Belgrade Center – Pančevo Glavna - Vršac – National border railway line, from km: 4+742 to km: 8+690
The section from ’’Pančevački Bridge’’ railway post to ’’Krnjača’’passing station, from km 4+742 to km 8+690 is supposed to be the first stage in accomplishment of the set ...
read moreGeneral and Preliminary designs for the Beli Potok-Vinča-Pančevo freight bypass railway line together with road-railway bridge over the Danube River near Vinča
At the moment, the rail freight transport runs through the Sava Amphitheatre area. About 1.5 million tones of goods, out of which 60% are hazardous substances are transported ...
read moreConceptual and Final designs for reconstruction and upgrading of the existing level crossings
Level crossings are always recognized as dangerous places, i.e. ''black spots'' on which numerous traffic accidents have been reported ...
read more